ANALISIS SISTEM KERJA DAN PERAWATAN ANDON DI PT. SHOETOWN KASOKANDEL INDONESIA

  • Ogi Suprayogi Universitas Majalengka
  • Eidelweis Dewi Jannati Universitas Majalengka
Keywords: system, downtime, andon, buyer, team leader

Abstract

On a the shoe factory often happenned downtime (production stop), less response from the mechanic or team leader. The problem, can be overcome by andon, andon is a system monitoring and panel audio visual from electric useful to fast on information to mechanic or team leader, the system andon work when it happenned a problem at production. This study aims to analiyze the system and care in andon directly in field because comapny in demand to fulfill a request from buyer. The research method is by means of a survey directly to the factory area and the result of direct interviews of resourch persons and operators that are contained in the plant. After doing research 8 hours usage/ day andon relieve the operator to contact the team leader and technicians concerned if quality problems occur and damage to the machine.

Author Biographies

Ogi Suprayogi, Universitas Majalengka

Prodi Teknik Mesin, Fakultas Teknik Universitas Majalengka

Eidelweis Dewi Jannati, Universitas Majalengka

Fakultas Teknik Universitas Majalengka

Published
2019-10-01
How to Cite
Suprayogi, O., & Dewi Jannati, E. (2019). ANALISIS SISTEM KERJA DAN PERAWATAN ANDON DI PT. SHOETOWN KASOKANDEL INDONESIA. SEMINAR TEKNOLOGI MAJALENGKA (STIMA), 4(1), 104-111. Retrieved from https://prosiding.unma.ac.id/index.php/stima/article/view/248