EARNED VALUE ANALYSIS TERHADAP BIAYA PADA PROYEK REHABILITASI JALAN GANDU – PANONGAN

  • Asep Saepudin Universitas Majalengka.
  • Arief Rijaluddin Universitas Majalengka
Keywords: Results Value Concept, BCWP, BCWS, ACWP

Abstract

Good management is needed to control a construction project, in order to achieve the efficiency and effectiveness of project management, so that the results of the process of controlling costs, quality, and time are achieved that meet the planning. The method that can be used in controlling costs and time and can address the achievement of activities is the Method of Value Results Concept (EVC). Concept Method Value Results is a method of calculating the number of costs according to the budget in accordance with the work that has been completed or implemented. The Concept of Value Results Method can be used to analyze performance and make estimates of achievement of targets by using three indicators, namely ACWP (Actual Cost Work Performed), BCWP (Budgeted Cost of Work Performed), and BCWS (Budgeted Cost of Work Schedule). Rehabilitation of the Gandu Panongan road has CV values = 0 and CPI = 1 shows costs in accordance with the planned budget. And on the image of the variance analysis calculation integrated with the "S" graph of the GanduPanongan Road Rehabilitation project, the work is completed sooner than the specified schedule, namely, from April to June and in the field, the project starts in April 3rd week and finishes faster that is in May 3rd week.

Author Biographies

Asep Saepudin , Universitas Majalengka.

Fakultas Teknik, Universitas Majalengka

Arief Rijaluddin, Universitas Majalengka

Fakultas Teknik, Universitas Majalengka

Published
2019-10-01
How to Cite
Saepudin , A., & Rijaluddin, A. (2019). EARNED VALUE ANALYSIS TERHADAP BIAYA PADA PROYEK REHABILITASI JALAN GANDU – PANONGAN . SEMINAR TEKNOLOGI MAJALENGKA (STIMA), 4(1), 162-168. Retrieved from https://prosiding.unma.ac.id/index.php/stima/article/view/258